Quality Construction in the Hudson Valley
Excavations
Water Main
Asphalt & Paving
Snow Removal & Plowing
Sewer Main
Drainage
Concrete Curbs & Sidewalks
Our Mission is to perform and execute the highest level of quality construction services for our customers at fair and competitive prices
Starting as a Landscaping Business 70 Years ago in Mount Vernon, NY, Michael Morano and his two sons Angelo & Nicholas Morano began of what would become a 5 generation long successful construction corporation. A Union business for now 45 years handling anything from Excavation utilities, paving, site work, site construction, drainage, heavy highway & utility to plowing. The company is now owned and run by Michael Morano III, Michael Morano's great great grandson.
Why Us?
74
Years
Serving the Hudson Valley in NY state
$1M
Million
Machinery and Equipment
OSHA
Safety Certification
All management employees and workers are OSHA-10 and OSHA-30 certified and we continuously re-evaluate and train our personnel
1,000
Projects
Morano Brothers have developed and successfully completed during its lifetime
Jobs
ADA Transit Accessibility II
Putnum County DPW
Multiple location pedestrian access improvement projects located in Brewster and Carmel, NY. Work included clearing and grubbing, drainage installation, precast gravity (Redi-Rock) retaining walls, Concrete curbs and sidewalks, Asphalt paving, erosion control.
Crabapple Lane Drainage
Town of Clarkstown
Large diameter drainage pipe replacement located in Nanuet, NY. Erosion control, concrete curbs, and asphalt restoration.
Home Depot /Costco
Morris Brothers – Yonkers NY
Excavation of over 300,000 CY. 200,000 CY of rock removal, processing and reuse on site. 75000 cy of excavation for building foundations and retaining walls. Constructed 38’ high retaining walls (T-walls). Included all roadwork and associated traffic signals and striping.
Broadway Sidewalks
Town of Cortlandt
Streetscape project which included major drainage improvements including large diameter reinforced concrete pipe and an underground detention system. Concrete curbs and sidewalks as well as roadway redesign and asphalt paving.
Kanawauke Road
Orange County DPW
Asphalt milling and paving of existing roadway. Total of 4500 tons of asphalt placed. Three precast concrete culverts installed while maintaining vehicular and pedestrian traffic. Total of six G.R.E.S. retaining walls installed at various locations on the project. Drainage structures, piping, and water quality systems installed. Over 3 miles of guide rail installed as per plan.
Asphalt Mill & Fill
The City of Peekskill
Milling and asphalt paving of various roadways throughout the City of Peekskill. Approximately 7000 tons of asphalt placed on this project. Maintenance and protection of vehicle and pedestrian traffic, Adjustment of over 100 utility manholes and drainage structures to meet the newly proposed road grades.
Call Hollow Rd. Drainage
Rockland County DPW
24” Reinforce Concrete Pipe installation, Clearing, and Grubbing, Rock removal, Asphalt restoration.
Team
Rick Happens
Project Manager/Estimator
914.788.8460
Michael Morano III
Owner | CEO
914.788.8460
Andrew R. Ciralli
Vice President / Chief Estimator
914.788.8460
Brandi Vanasco
Officer Manager
914.788.8460
Jack Rodriguez
Project Manager / Superintendent
914.788.8460
Quality Construction in the Hudson Valley
Excavations
Water Main
Asphalt & Paving
Snow Removal & Plowing
Sewer Main
Drainage
Concrete Curbs & Sidewalks
Our Mission is to perform and execute the highest level of quality construction services for our customers at fair and competitive prices
Starting as a Landscaping Business 70 Years ago in Mount Vernon, NY, Michael Morano and his two sons Angelo & Nicholas Morano began of what would become a 5 generation long successful construction corporation. A Union business for now 45 years handling anything from Excavation utilities, paving, site work, site construction, drainage, heavy highway & utility to plowing. The company is now owned and run by Michael Morano III, Michael Morano's great great grandson.
Why Us?
74
Years
Serving the Hudson Valley in NY state
$1M
Million
Machinery and Equipment
OSHA
Safety Certification
All management employees and workers are OSHA-10 and OSHA-30 certified and we continuously re-evaluate and train our personnel
1,000
Projects
Morano Brothers have developed and successfully completed during its lifetime
Jobs
ADA Transit Accessibility II
Putnum County DPW
Multiple location pedestrian access improvement projects located in Brewster and Carmel, NY. Work included clearing and grubbing, drainage installation, precast gravity (Redi-Rock) retaining walls, Concrete curbs and sidewalks, Asphalt paving, erosion control.
Crabapple Lane Drainage
Town of Clarkstown
Large diameter drainage pipe replacement located in Nanuet, NY. Erosion control, concrete curbs, and asphalt restoration.
Home Depot /Costco
Morris Brothers – Yonkers NY
Excavation of over 300,000 CY. 200,000 CY of rock removal, processing and reuse on site. 75000 cy of excavation for building foundations and retaining walls. Constructed 38’ high retaining walls (T-walls). Included all roadwork and associated traffic signals and striping.
Broadway Sidewalks
Town of Cortlandt
Streetscape project which included major drainage improvements including large diameter reinforced concrete pipe and an underground detention system. Concrete curbs and sidewalks as well as roadway redesign and asphalt paving.
Kanawauke Road
Orange County DPW
Asphalt milling and paving of existing roadway. Total of 4500 tons of asphalt placed. Three precast concrete culverts installed while maintaining vehicular and pedestrian traffic. Total of six G.R.E.S. retaining walls installed at various locations on the project. Drainage structures, piping, and water quality systems installed. Over 3 miles of guide rail installed as per plan.
Asphalt Mill & Fill
The City of Peekskill
Milling and asphalt paving of various roadways throughout the City of Peekskill. Approximately 7000 tons of asphalt placed on this project. Maintenance and protection of vehicle and pedestrian traffic, Adjustment of over 100 utility manholes and drainage structures to meet the newly proposed road grades.
Call Hollow Rd. Drainage
Rockland County DPW
24” Reinforce Concrete Pipe installation, Clearing, and Grubbing, Rock removal, Asphalt restoration.
Team
Rick Happens
Project Manager/Estimator
914.788.8460
Michael Morano III
Owner | CEO
914.788.8460
Andrew R. Ciralli
Vice President / Chief Estimator
914.788.8460
Brandi Vanasco
Officer Manager
914.788.8460
Jack Rodriguez
Project Manager / Superintendent
914.788.8460
Quality Construction in the Hudson Valley
Excavations
Water Main
Asphalt & Paving
Snow Removal & Plowing
Sewer Main
Drainage
Concrete Curbs & Sidewalks
Our Mission is to perform and execute the highest level of quality construction services for our customers at fair and competitive prices
Starting as a Landscaping Business 70 Years ago in Mount Vernon, NY, Michael Morano and his two sons Angelo & Nicholas Morano began of what would become a 5 generation long successful construction corporation. A Union business for now 45 years handling anything from Excavation utilities, paving, site work, site construction, drainage, heavy highway & utility to plowing. The company is now owned and run by Michael Morano III, Michael Morano's great great grandson.
Why Us?
74
Years
Serving the Hudson Valley in NY state
$1M
Million
Machinery and Equipment
OSHA
Safety Certification
All management employees and workers are OSHA-10 and OSHA-30 certified and we continuously re-evaluate and train our personnel
1,000
Projects
Morano Brothers have developed and successfully completed during its lifetime
Jobs
ADA Transit Accessibility II
Putnum County DPW
Multiple location pedestrian access improvement projects located in Brewster and Carmel, NY. Work included clearing and grubbing, drainage installation, precast gravity (Redi-Rock) retaining walls, Concrete curbs and sidewalks, Asphalt paving, erosion control.
Crabapple Lane Drainage
Town of Clarkstown
Large diameter drainage pipe replacement located in Nanuet, NY. Erosion control, concrete curbs, and asphalt restoration.
Home Depot /Costco
Morris Brothers – Yonkers NY
Excavation of over 300,000 CY. 200,000 CY of rock removal, processing and reuse on site. 75000 cy of excavation for building foundations and retaining walls. Constructed 38’ high retaining walls (T-walls). Included all roadwork and associated traffic signals and striping.
Broadway Sidewalks
Town of Cortlandt
Streetscape project which included major drainage improvements including large diameter reinforced concrete pipe and an underground detention system. Concrete curbs and sidewalks as well as roadway redesign and asphalt paving.
Kanawauke Road
Orange County DPW
Asphalt milling and paving of existing roadway. Total of 4500 tons of asphalt placed. Three precast concrete culverts installed while maintaining vehicular and pedestrian traffic. Total of six G.R.E.S. retaining walls installed at various locations on the project. Drainage structures, piping, and water quality systems installed. Over 3 miles of guide rail installed as per plan.
Asphalt Mill & Fill
The City of Peekskill
Milling and asphalt paving of various roadways throughout the City of Peekskill. Approximately 7000 tons of asphalt placed on this project. Maintenance and protection of vehicle and pedestrian traffic, Adjustment of over 100 utility manholes and drainage structures to meet the newly proposed road grades.
Call Hollow Rd. Drainage
Rockland County DPW
24” Reinforce Concrete Pipe installation, Clearing, and Grubbing, Rock removal, Asphalt restoration.
Team
Rick Happens
Project Manager/Estimator
914.788.8460
Michael Morano III
Owner | CEO
914.788.8460
Andrew R. Ciralli
Vice President / Chief Estimator
914.788.8460
Brandi Vanasco
Officer Manager
914.788.8460
Jack Rodriguez
Project Manager / Superintendent
914.788.8460
Quality Construction in the Hudson Valley
Excavations
Water Main
Asphalt & Paving
Snow Removal & Plowing
Sewer Main
Drainage
Concrete Curbs & Sidewalks
Our Mission is to perform and execute the highest level of quality construction services for our customers at fair and competitive prices
Starting as a Landscaping Business 70 Years ago in Mount Vernon, NY, Michael Morano and his two sons Angelo & Nicholas Morano began of what would become a 5 generation long successful construction corporation. A Union business for now 45 years handling anything from Excavation utilities, paving, site work, site construction, drainage, heavy highway & utility to plowing. The company is now owned and run by Michael Morano III, Michael Morano's great great grandson.
Why Us?
74
Years
Serving the Hudson Valley in NY state
$1M
Million
Machinery and Equipment
OSHA
Safety Certification
All management employees and workers are OSHA-10 and OSHA-30 certified and we continuously re-evaluate and train our personnel
1,000
Projects
Morano Brothers have developed and successfully completed during its lifetime
Jobs
ADA Transit Accessibility II
Putnum County DPW
Multiple location pedestrian access improvement projects located in Brewster and Carmel, NY. Work included clearing and grubbing, drainage installation, precast gravity (Redi-Rock) retaining walls, Concrete curbs and sidewalks, Asphalt paving, erosion control.
Crabapple Lane Drainage
Town of Clarkstown
Large diameter drainage pipe replacement located in Nanuet, NY. Erosion control, concrete curbs, and asphalt restoration.
Home Depot /Costco
Morris Brothers – Yonkers NY
Excavation of over 300,000 CY. 200,000 CY of rock removal, processing and reuse on site. 75000 cy of excavation for building foundations and retaining walls. Constructed 38’ high retaining walls (T-walls). Included all roadwork and associated traffic signals and striping.
Broadway Sidewalks
Town of Cortlandt
Streetscape project which included major drainage improvements including large diameter reinforced concrete pipe and an underground detention system. Concrete curbs and sidewalks as well as roadway redesign and asphalt paving.
Kanawauke Road
Orange County DPW
Asphalt milling and paving of existing roadway. Total of 4500 tons of asphalt placed. Three precast concrete culverts installed while maintaining vehicular and pedestrian traffic. Total of six G.R.E.S. retaining walls installed at various locations on the project. Drainage structures, piping, and water quality systems installed. Over 3 miles of guide rail installed as per plan.
Asphalt Mill & Fill
The City of Peekskill
Milling and asphalt paving of various roadways throughout the City of Peekskill. Approximately 7000 tons of asphalt placed on this project. Maintenance and protection of vehicle and pedestrian traffic, Adjustment of over 100 utility manholes and drainage structures to meet the newly proposed road grades.
Call Hollow Rd. Drainage
Rockland County DPW
24” Reinforce Concrete Pipe installation, Clearing, and Grubbing, Rock removal, Asphalt restoration.
Team
Rick Happens
Project Manager/Estimator
914.788.8460
Michael Morano III
Owner | CEO
914.788.8460
Andrew R. Ciralli
Vice President / Chief Estimator
914.788.8460
Brandi Vanasco
Officer Manager
914.788.8460
Jack Rodriguez
Project Manager / Superintendent
914.788.8460