  • Maria Fareri Children’s Hospital – Valhalla – Site work including building foundation excavation and backfill which required sheeting installation as well as underpinning.  Utility installation including sewer, water, and drainage. Site concrete including curbs and sidewalks, as well as grading and paving of all parking lots.

 

 

 

  • Indian Point – Buchanan, NY – Constructed mausoleum and temporary structure for nuclear reactors located in Peekskill NY.  Site work including excavation and backfill for building foundations. Highly secure work zone.

 

 

 

  • Home Depot /Costco – Morris Brothers – Yonkers NY – Excavation of over 300,000 CY.  200,000 CY of rock removal, processing and reuse on site. 75000 cy of excavation for building foundations and retaining walls.  Constructed 38’ high retaining walls (T-walls). Included all roadwork and associated traffic signals and striping.

 

 

  • Home Depot – March Associates – Fishkill NY – Excavation and backfill for building foundations and slabs.  Total of 48000 CY of import for grading of parking lots. Underground utilities including a sewage pump station.  Concrete curbs and sidewalks and asphalt paving of lots and roadways. All required traffic signal work and striping.  

 

 

  • Maple Ave Streetscape – Town of Ramapo – Monsey NY – Large scale streetscape which included relocation of below ground and overhead utilities including fiber optic cable and high tension power lines.  Drainage structure and piping as well as concrete/granite curbs and sidewalks including decorative pavers. Decorative street lighting and all required traffic signal work.

 

 

  • Rockland Boulder Stadium – Town of Ramapo – Pomona NY – Site work including 350,000 CY of excavation and embankment on a 36-acre site.  Installation of all utilities and drainage including a design/build precast bridge. Concrete curbs and sidewalks as well as all the required asphalt paving of lots and roadways.  NYSDOT Route 45 was widened and traffic signals were upgraded. This project was completed within the required time frame of 11 months from start to finish.

 

 

  • South Main Street – Town of Clarkstown – New City NY – Large scale streetscape which included reconstruction of roadways, utility relocations and installations, granite curbs and colored sidewalks with decorative pavers.  Cast in place concrete retaining wall with stone veneer as well as decorative street lighting and traffic signals. A cast in place fountain with decorative tile and lighting was constructed. All required full-depth asphalt paving of roadways and driveways.

 

  • Westchester County Airport Taxiway “A” – Westchester County DPW/FAA – White Plains NY – Taxiway reconstruction including mass excavation and replacement with subbase material and asphalt.  Coordinated with airport operations and adhered to FAA guidelines while performing the required work. Taxiway lighting installed as well as all required stripping of the taxiway.

 

  • Route 32 – NYSDOT – Central Valley NY – Full depth reconstruction of roadway including utility relocation and installation.  Worked closely with NYSDOT and business owners to provide access to all businesses at all times during construction. Cast in place concrete retaining walls, concrete curbs and sidewalks, decorative street lighting, traffic signals, and asphalt paving of roadways and driveways.

 

 

  • Route 100A/100B – NYSDOT – Greenburgh NY – Reconstruction of roadways including rubbilization of existing concrete road.  Underground utility relocation and installation. Concrete retaining walls as well as concrete curbs and sidewalks. Traffic signals installed over highly traveled intersection as well as asphalt paving and striping.

 

 

 

  • Route 120 – NYSDOT – Harrison NY – Asphalt milling, reclamation, and asphalt paving of multiple locations.  Total of 7500 tons of asphalt placed. Adjustment of over 50 utility and drainage structures to the newly proposed road grades.  Traffic signals and striping as required.

 

 

 

  • Route 9 - NYSDOT  - Sleppy Hollow NY – Asphalt milling and paving of roadway including adjustment of utility structures as well as traffic signals and striping. Total of 3500 tons of asphalt placed.  

 

 

 

 

  • Route 121 – NYSDOT – Lewisboro NY – Asphalt milling, reclamation, and asphalt paving of multiple locations.  Total of 5500 tons of asphalt placed. Adjustment of over 30 utility and drainage structures to the newly proposed road grades.  Traffic signals and striping as required.

 

 

 

  • Kanawauke Road – Orange County DPW – Stony Point – Asphalt milling and paving of existing roadway.  Total of 4500 tons of asphalt placed. Three precast concrete culverts installed while maintaining vehicular and pedestrian traffic.  Total of six G.R.E.S. retaining walls installed at various locations on the project. Drainage structures, piping, and water quality systems installed.  Over 3 miles of guide rail installed as per plan.

 

  • Furnace Dock Bridge Rehabilitation – NYSDOT - Croton on Hudson NY – (3) 13’ diameter x 120 lf culvert relining utilizing hand place rebar and shotcrete.  Staged construction, clearing, and grubbing, temporary access road construction on a severe incline, dewatering, erosion control, culvert pipe repair, landscaping, guide rail installation.

 

 

 

  • Call Hollow Rd. Drainage – Rockland County DPW – 24” Reinforce Concrete Pipe installation, Clearing, and Grubbing, Rock removal, Asphalt restoration.

 

 

 

 

  • Forshay Rd. Drainage – Rockland County DPW – Various drainage pipe installation, asphalt restoration, asphalt driveways, decorative paver installation.

 

 

 

 

  • Hydrant & Valve Replacement – Westchester County DPW – Total of 15 Fire hydrant and valves replaced on the Westchester Medical Center Campus located in Valhalla, NY.  Excavation and installation of Fire hydrants and the required shut off valves. Asphalt restoration.

 

 

 

 

  • ADA Transit Accessibility II – Putnum County DPW – Multiple location pedestrian access improvement projects located in Brewster and Carmel, NY.  Work included clearing and grubbing, drainage installation, precast gravity (Redi-Rock) retaining walls, Concrete curbs and sidewalks, Asphalt paving, erosion control.

 

 

 

  • Broadway Sidewalks – Town of Cortlandt – Streetscape project which included major drainage improvements including large diameter reinforced concrete pipe and an underground detention system.  Concrete curbs and sidewalks as well as roadway redesign and asphalt paving.

 

 

 

 

  • Crabapple Lane Drainage – Town of Clarkstown – Large diameter drainage pipe replacement located in Nanuet, NY.  Erosion control, concrete curbs, and asphalt restoration.

 

 

 

 

 

  • Asphalt Mill & Fill – The City of Peekskill – Milling and asphalt paving of various roadways throughout the City of Peekskill.  Approximately 7000 tons of asphalt placed on this project. Maintenance and protection of vehicle and pedestrian traffic, Adjustment of over 100 utility manholes and drainage structures to meet the newly proposed road grades.

 

 

  • Tappan Zee High School – Thruway Authority of New York – Site work included excavation and embankment for Bio-Retention water quality sedimentation ponds and underground retention systems used for treating stormwater runoff. Drainage structures and piping, Trench Drains, Gabion walls, Landscaping, Asphalt Restoration, Interpretive Signs.

 

 

  • Route 22 Scarsdale & Yonkers Ave. Yonkers – NYSDOT – Asphalt mill & fill over two large highly traveled roadways performed entirely at night.  Approximately 18000 tons of asphalt placed on this project. Adjusted over 200 utility manholes and drainage structures to the newly proposed roadway grades.  Surveyed and redesigned cross slopes on Route 22 in Scarsdale. Removed and replaced 62 handicap ramps as per ADA requirements. Traffic signal work, Cleaning of drainage structures, and Striping.

 

 

 

  • Yonkers Fire Station #1 – The City of Yonkers – Site work including excavation and backfill for building foundations and retaining walls.  Removal and replacement of contaminated material from the site, Rock Excavation, Site utilities including sewer, water, gas, and electric. Site drainage including drainage structures and an underground detention system.  